skip to main
|
skip to sidebar
AILERONS (testing)
Tuesday, September 11, 2007
The rest of nose rib pairs B & C are drilled with nutplate holes + rivet holes.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2007
(23)
▼
September
(23)
This is the inboard inspection hole with the spar ...
Drill the inspection hole cover mounting screw hol...
With the doubler clamped in position, #40 bit is u...
Duplicate the process for the other inspection hol...
Mark locations for the inspection hole doubler riv...
No title
Drilling the nose ribs with #30 bit except the hol...
Tadaaah!!!...
Here, i am seen drilling the aft rib holes with #3...
The end result after lots of drilling..
I am seen here drilling the spar holes with #40 bit.
With the assembly clamped upside-down on the bench...
Note, i did not follow the manual strictly w/regs ...
With two cellophone tapes with width of exactly 1/...
Drilling the nose ribs and bracket with #30 bit.
Outboard hinge bracket holes being drilled.
Another hinge bracket being drilled. Note this inb...
After all dimpling have been completed...
Dimpling the ribs and nutplates in progress..
The rest of nose rib pairs B & C are drilled with ...
With the pilot holes marked & center punched, the ...
Cleco the appropriate nose ribs together in prepar...
Arrangement of all de-burred aileron parts readied...
About Me
Unknown
View my complete profile
No comments:
Post a Comment